Forum


ShareSansar Main Page

New Topic

सानिमा माईका लगानीकर्तालाई झड्का

Moderators: बिमलमान, Dilbert.

Post Reply

Page: 1 2 >

Author Post
Moderator
Registered: Jun 2013
Posts: 574
Location: Kathmandu, Nepal
If the policy covers natural disasters (I am assuming this in-fact is there), this is natural disaster and should be paid out.
Member
Registered: May 2014
Posts: 77
Sammerji. In film of Pares Rawol "Oh My God". The insurance company will not componsate the damage and loss cause by "Act of God". Does the insurance company will compensate this or not ?

As well as the BPCL is decreasing hugely does it will be wise decision if i bought it ?
Member
Registered: May 2014
Posts: 77
Thanks Sameerji for pickout my misunderstanding. :)
Member
Registered: Apr 2014
Posts: 63
dear Investor The SHPC's
Location is

Danabari and Chisapani VDC,Illam District , Eastern Development Region of Nepal

So no think to worry
Member
Registered: Jun 2013
Posts: 193
Does not effect for sanima mai hydro from Sunkoshi River flooding, it is located in iliam, no panic. check http://www.maihydro.com/index.php?page=executive
Moderator
Registered: Jun 2013
Posts: 574
Location: Kathmandu, Nepal
Even if insurance covered everything, think of the loss in terms of more load-shedding, which in turn will increase the operating profit of all companies in Nepal.
Moderator
Registered: Jun 2013
Posts: 574
Location: Kathmandu, Nepal
Are both Sanima Sunkoshi (2.5MW) and Sanima Mai (22MW) by the same company?
Member
Registered: Jul 2013
Posts: 986
insurance gare pani loss ta bhayo ni in terms of delayed construction of the project, cost escallation due to increased price of dollar etc etc
Member
Registered: Jun 2013
Posts: 44
DON,T WORRY FRIENDS SANIMA HYRDRO LE INSURANCE GAREKO CHA
Member
Registered: Jul 2014
Posts: 97
The power house of Sanima Sunkoshi Project has been submerged. “The power house and all equipment are under the water,” said Tuk Prasad Paudel, director of Sanima Hydropower Company. Does anyone still think that this landslide effects would only put psychological effects on investors? I don't think so as the power house submerged in water means that the power house has turned to something not worth more than a kawadi.
Member
Registered: May 2014
Posts: 237
sameer ji well said. thanks for explainations in time. little knowledge is always dangerous things.
Member
Registered: Aug 2013
Posts: 840
karanji bank dubyo bhane nrb le bachaudaina.....nata insurance dubyo bhane insurance board le bachaucha.....another thing is that all the hydro project has insurance already done and these insurance are so big that insurance company does re insurance with foreign re insurance company.....so no loss to any company in Nepal.
And there is no effect to the sanima mai hydro till now for your information so u don't have to panic or even think about it.....this can be chance to grab sanima mai hydro power company share at lower price.
Member
Registered: May 2014
Posts: 77
Yes it will effects its whole sector.
Because theres also probability to another the same case.

And the most important the hydropower stock is most dangerious than other sector worldwide because there are three main risk in it:

1. Flood
2. Landslide &
3. Earthquake which cannot stop by noone.

Bank dubyo bhanay nrble sharedhanilai bachaucha.
Insurance dubyo bhanay beema sameetile sharedhanilai bachaucha
ra
hydro dubyo bhanay :roll: :roll: :roll:
Member
Registered: Oct 2013
Posts: 7920
It will affect psychologically....

Till yesterday, it was believed that hydro is all flesh and no bone.. now, after this incident... there could be a few bones in between...

To rebuild, it could take 2 yr. so this could impact 40 percentage of the cost/revenue...
Member
Registered: Dec 2013
Posts: 132
Sanima hydro and Sanima Mai Hydro are two different projects at two different locations. Therefore Sanima mai Hydro will not be affected by what has happened at Sunkoshi. This will also not affect Sanima bank at all as it has no investment in both the hydro power projects.
Member
Registered: Jul 2013
Posts: 986
but the company will bear loss, no doubt.
Member
Registered: Jun 2013
Posts: 91
Sanima hydro and sanima mai hydropower are 2 different projects. The one whose shares are trading is sanima mai hydro and it is situated in mai khola in Ilam district. The flood in Bhotekoshi do not effect Sanima mai hydropower.
Member
Registered: Oct 2013
Posts: 108
its sanima hydro sunkoshi, and current trading is of sanima mai hydro, about to lunch in operation project, doesn't affect much at all.
Member
Registered: Oct 2013
Posts: 7920
Surely decrease price of may be all hydro...

Now investors will stop making 10 yr prediction on hydro stocks....

That is why I only think of 2 yr max future regarding hydro....

Chilime will decrease as well because of this risk also until the project is complete,, in nepal, it will always take longer than predicted time to complete a project...

But I dont think sanima mai will come down to 200...

Have they insured this project?????
Member
Registered: May 2014
Posts: 15
Mai Hydropower Project (22 MW)
Upper Tamor Hydropower Project.(415 MW)
Mai Cascade Hydropower Project (7 MW)
Lower Likhu Hydropower Project (28.1MW)
Middle Tamor Hydropower Project (75 MW)
जस्ता परियोजनाहरू पाईपलाइनमा रहेको हुँदा भविष्यको सम्भावना कायम छ.
डुबेको हाइड्रोको पनि वीमा गराएको छ भने, कम्पनीले वीमाबाट कम्पेंसेसन पाउँछ..
धेरै आत्तिनु पर्दैन..
Member
Registered: Jul 2014
Posts: 97
200 ma ayo vane pani kasle linchha ra churlumma dubeko.pahilako NHPC ko jasto 40-50 halat ma aunchha ani balla buyer painchha.
Member
Registered: Mar 2014
Posts: 503
If its true...it will obviously effect SANIMA Bank...up to a extend only.
Member
Registered: Jul 2014
Posts: 63
Does it affect to sanima bank as well any ideas so far please share
Member
Registered: Oct 2013
Posts: 108
thorai paisa: then good for you saathi; 200 ma aayo bhane sabai liye bhai halyo ni 'thorai paisa' ma !!! hydropower is already sunk... as i just got informed, reaching up to bhotekoshi now. the tragedy for billions of financial loss.
Member
Registered: Jul 2014
Posts: 87
dubne vaiyo, pairo le purai hydro power dubyo. Aaba bholi dekhi share price ghatna thal6. 2/4 din dekhi vitra 200 ma aaucha.

Post Reply

Page: 1 2 >

Sharesansar Forum Powered By Miracle Hub